This week we are in the final stages of wrapping up a 12 year inspection on a 350B2. The aircraft will be completed and prepared to be shipped via shipping container this Thursday.
Some of the stages in the 12 year inspection include:
- Complete disassembly of the aircraft.
- Careful inspection of all flight controls.
- Any defective components are replaced or repaired.