12 Year Inspection Complete!

Transmission

This week we are in the final stages of wrapping up a 12 year inspection on a 350B2. The aircraft will be completed and prepared to be shipped via shipping container this Thursday.

Some of the stages in the 12 year inspection include:

  • Complete disassembly of the aircraft.
  • Careful inspection of all flight controls.
  • Any defective components are replaced or repaired.